AC Facades Company Ltd
Testing

Testing & verification.

Coordinate the testing, mock-ups and inspection evidence your façade package needs, from design development through manufacture and site review.

PROJECT TESTING

Testing in practice.

Testing photographs from Jardinia, Aire, Sebel fire windows and Bondi Junction.

PROJECT-SPECIFIC REQUIREMENTS

Agree the evidence.
Plan the verification.

Testing requirements are defined around the façade system, specification and project interfaces.

AC Facades coordinates testing and inspection requirements alongside engineering, documentation and manufacturing. The scope, programme and release requirements are agreed for each project.

TESTING SUPPORT

From mock-up to site.

Performance mock-ups

Performance Mock-Up (PMU) coordination to support the testing requirements of the project.

Visual mock-ups

Visual Mock-Up (VMU) inspections to review the proposed façade appearance and details.

Field testing & review

Field testing supervision and installation review, coordinated with project quality requirements.

QUALITY RECORDS

Connect findings
with action.

Inspection records, issue tracking and corrective action support traceability through manufacture. Agreed hold points connect the required evidence with release decisions.

Part of the wider quality process

Testing coordination sits alongside factory audits, manufacturing inspections and factory and site quality assurance.

Explore manufacturing & quality

Have a project we should review?

Share your drawings, specifications or tender package. Let’s discuss the right façade solution for your project.

Discuss your project